Having taken place in 2005-2006, the continuous casting machine construction at the Alchevsk Iron and Steel Works, in particular, involved supplies and installation of 60-meter-high steel constructions. Within 14 months more than 10 thousand tons of them were swiftly manufactured and mounted by Ukrstalkonstruktsiya as turnkey facilities.
In line with the contract made with the construction general contractor JV «Osnova-Solsif» OJSC Ukrstalkonstruktsiya designed, manufactured and supplied 2 200 tons of steel structures for the erection of ceramic tiles and sanitaryware plant workshops. The construction usable area reached 62 000 sq.m.
Initially, the project designs were drawn up by a European design bureau in accordance with Ukrainian regulations. They...
GOSTOMEL GLASS FACTORY CONTAINERS TERMINAL (Gostomel, Ukraine) Under the tight time schedule, OJSC «Ukrstalkonstruktsiya» provided a full range of services, namely designed, manufactured and installed a ready-to-operate industrial building for the Gostomel glass factory. The exclusive design was realized in one thousand tons of metal structures erected at the site.