During 2009-2011 OJSC “Ukrstalkonstruktsiya” had been executing design development, manufacture and mounting of steel structures within the framework of “Business Center “Rialto” reconstruction and 3-floors extension” project at the address: 18 Novokonstantinovskaya Str., Kiev.
Designing started from pre-design analysis of technical solutions for estimation of reconstruction volumes and...
SHOPPING CENTRE NOVUS-PRAKTIKER, Ring-road, Kiev Starting from April through November 2009 OJSC "Ukrstalkonstruktsiya " has participated in shopping center construction in one of capital residential areas - Novus-Praktiker (Svyatoshinsky district, Kiltseva doroga , 12, Kyiv). 228 tons of steel structures were produced for building with GFA of 14 000 sq.m. 518 tons of steel frame, as well as 1 200 sq.m. of wall cladding sandwich type panels were installed. In addition,...
The recently fulfilled project of the International Exhibition Center is of a particular interest, as exclusive pipe constructions were applied at the site. 2 thousand tons of them were successfully manufactured, supplied and installed by OJSC “Ukrstalkonstruktsiya”. Over a very short span of time large-span and vast exposition halls and show-rooms constructed by Ukrstalkonstruktsiya specialists have made the...
Unique steel assembling operation on the water was carried out by Ukrstalkonstruktsiya in late 2008 - early 2009. During this period the company was a steel structure manufacture and construction contractor, and also accomplished enclosing structure design, manufacture and assembly for the extension of the ship during its conversion under the hotel. Dimensions of the ship - 140 meters x 18 meters, the extension size - 137 meters x...